Misc Links
Forum Archive
News Archive
File DB
 

ECS manufacturing in ShenZhen
Posted by News-Bot on June 17th 2006



Before the motherboard can begin to take shape, the inner layer must be sheared and drilled. There are about 15,000 holes made in each inner layer motherboard. The process takes around 30 minutes to complete ten 'inner layer' PCBs at a time on each machine.

View article at bit-tech.net



(Due to past abuse from spammers you must be a registered forum member to post comments, and must be logged in)


corner image

This site best viewed in a W3C standard browser at 800*600 or higher
Site design by Red Squirrel | Contact
© Copyright 2017 Ryan Auclair/IceTeks, All rights reserved